GSheet of unfulfilled orders from v2:
https://docs.google.com/spreadsheets/d/1tzYavC3oAypevmC4_1x9aZbOdaGlE8dhvjYXRuUxYhw/edit?usp=sharing
v2.5 complete apart from a few orders that need
replacements.
Section for updates:
3/31/2017
The buy is largely
complete apart from some orders that need replacements
made.
Older updates:
More
Status of dark blue(gray blue)/light gray orders:
More
Responses received from all affected. The above chart
shows what you will receive, under “New case” and “New
plate”.
If something seems off right there, please
please please tell me ASAP. I tried my best to consolidate
everyone’s responses and sort through them without error,
but human error is still possible.
The “Extras” will be
for sale as kits after the U.S. orders are shipped out Need
money for the second batch, so the extras are for sale right
now, along with a v1 or v2 PCB, although they will take a
while to ship as well.
10/28/2016
Progress update
https://geekhack.org/index.php?topic=80649.msg2291319/#msg2291319
10/3/2016
Sorry for the lapse in communication.
I’m still here, still working to get orders out. Biggest
issues at the moment are coordinating with my family members
to get some things sorted and organized Stateside, the
national Chinese holiday this week grinding everything to a
halt, and lack of time.
Currently, there are several
international orders that have yet to be shipped, as well as
the US orders from the extras sale which are awaiting
PCBs.
The color remake batch for R2 is running into
delays as well. The designer told me the factory was
inundated with work, and yet is currently on vacation (it’s
like
Independence Day for China, but for this whole week).
A couple more
international orders were sent out. Once they’ve been
collected by the reshipper and shipped, I will send the
tracking /#s to the recipients.
8/30/2016
Getting
some international orders out the door today. :^)
8/28/2016
Upon
the behest of my parents and family I’ve been keeping my
grandfather company. Will resume sorting of int’l orders
once I return to my apartment tomorrow. Everything is
already boxed and I just have to verify the contents, and
the ones I’ve already checked were fine.
Also launched
v2.5 buy at the top.
8/25/2016
I’ve landed and am
okay. Gonna double check the
international orders
once I make time and combat the jet lag.
Happy to see
pics flowing in.
8/23/2016
Getting on my flight soon. The
shipments are mostly 2-day but the 2-day shipments are
supposed to arrive on Thursday despite being shipped out on
Monday. Odd.
See you guys on the other side (of the
world). I’ll update when I land to tell you guys I’m okay.
Then int’l orders will be shipped out.
The second batch
(for the mistaken color remakes) is still in production and
I will update on that as I get news.
8/21/2016
Shipping out tomorrow. Everything is in Priority Mail
2 Day except for Texas dudes so most should arrive on
Wednesday. Dunno why it takes 3 days for TX when CA is
2-day.
I’ll be on my flight back to China starting
Tuesday morning. Looking forward to seeing some pics when I
land.
8/17/2016
Short album.
US orders: Cases assembled. Need to finish sorting
stabilizers and plates, test every PCB, then pack and ship.
Should be able to get most of them out the door on Friday
Monday.
8/15/2016
Stuff for the US orders have
arrived:
http://sli.mg/a/PCVshf, with the exception of a few PCBs.
Going to get these
out in the order that orders were received. Thanks for your
patience folks.
7/24/2016
I took a couple days off
because of all the issues that keep popping up regarding my
buys and it was getting a bit overwhelming, apologies for
the late reply and update. Bad news. All the international
orders were packed in time by my dad after several
all-nighters coordinating with him via video chat (all
because the PCBs didn’t arrive in time before my flight from
China), but they were unable to be shipped out.
Reason:
More
The reason for that was the passing of my grandmother who
had terminal cancer at the age of 80, and her illness was
the reason that my dad went to China in the first place.
This date coincided with the packing of the boards and my
dad’s flight out of China on the 22nd, and I wasn’t going to
force him to pack and ship some orders, however important
they are, and take time away from my grandma’s final
moments. It’s a ////ty situation all around.
So the international
orders can’t be sent out until I return to China a month
from now. I know I’ve kept you guys waiting and I’m
sorry for that, but please bear with me a bit longer.
Acrylic
diffuser plates are getting remade for the US orders
because the screw holes connecting those to the case are
misaligned. That’s already done and en route to the
designer who will be shipping the other orders to me.
7/15/2016
International
orders are being worked on right this moment in China,
and I’m coordinating it from the U.S. DHL tracking
numbers will be available in approximately one week for
int’l, and I will contact the buyers accordingly.
Screw
mount stabs are being delayed, and orders w/ screw mount
stabs are also delayed as a result. The team’s been
working on the screw mount stabs and the molds for
those, and they’re repeatedly fine-tuning the design. I
should have more news on those next week.
Appreciate
your patience, everyone.
7/14/2016
I’m in the
US woooooooo
PCBs arrived in China. Need some time,
but they’ll get sorted and the int’l orders shipped.
U.S. orders are being prepped for shipment from China
but pending a thorough recount of both int’l and U.S.
orders to make sure there won’t be any mis-sent
items.
7/12/2016
Finished sorting the
responses for the color mistake. The second order will
be sent to the factory very soon.
Prepping the
remaining orders for shipment right now. Leaving for the
plane in 5 hours.
PCBs were delayed because the guy
who was supposed to send them to be was slow to act
despite my reminding him daily for an entire week (////). They’ll arrive tomorrow and I have someone
ready to sort and pack, then ship.
7/11/2016
Still
collecting responses on the course of action for gray/dark
blue and light gray.
Made a
temporary new color chart.
7/10/2016
Light blue and light gray buyers,
please read through
this post
and reply with your thoughts, and PM me what you’d like to
do if you don’t want to wait for the form to be up.
7/9/2016
No words, only pics.
… okay, somewords. I’ve received most of the
cases for international orders and am putting them together.
The PCBs should reach my hands tomorrow or the day after,
and int’l orders will be shipped by then. The sole int’l
purple case order is delayed a bit as the designer sent me
the engraved version meant for someone else, so the designer
will be sending out the purple order once I send him the
PCB, plate, and stabilizers associated with that order.
U.S.
orders will be fulfilled by me once I’m back in the U.S.,
starting on the 13th.
7/7/2016 pt.2
Got some stuff
in the mail~
What could they be…?
7/7/2016
International orders
for PCBs and cases are both on their way to me. US orders
are being prepped for shipment by the others. My flight was
pushed back to the 12th which gives a bit of extra breathing
room for sorting the int’l orders myself.
7/2/2016
Manufacturing
is complete. The cases are en route to the designer from the
factory, who will be sorting through them briefly before
sending them to me, since he has the rubber feet and screws
for the cases (and the bonus). PCBs are all finished as well
and the ones for international orders are en route to me
(also including the bonus). There’s a chance that they won’t
make it in time before I get on my flight to the U.S. on the
10th. If that happens, I have at least two other capable
individuals in China who can take care of the international
orders, so no problems there.
6/15/2016
Just checking in. No news. Anodizing
should finish well before the month is over.
6/7/2016
CNCing
has finished for the ZZ96 cases. Anodizing is next.
PCB
production is complete. Currently having components
soldered.
6/1/2016
Invoices for the additional costs have
been sent out. Thanks all.
The plate has been revised
to accommodate for switch top removal of every possible
switch location.
Production is already underway. I will
post an approximate ETA once I get word.
Also sent out
invoices for the bonus item.
5/29/2016
The
invoices for the additional costs will go out over the next
48 hours.
5/24/2016
Funds successfully transferred
to China. Cases cost 100 RMB more than the price I had down
from the last buy (because of the “new materials/factory”,
which is supposed to be higher quality). I paid it off using
the entire contingency fund and more, and am now projected
to be in the red for this buy. Probably going to have to
invoice all buyers for the difference once again.
////,
I really didn’t want to have something like this happen
after saying that there weren’t gonna be extra fees in the
beginning.
5/21/2016
No real news but it’s been 6
days so I thought I’d chime in. Finalizing the transfer and
the money is almost all here. Received the notification last
night that I should be receiving it in another day or
two.
This is going slower than I expected.
5/15/2016
Still
in the midst of transferring funds. Also ran into a wall w/
Chase after the rep told me I couldn’t make the transfer.
Attempting a different method. Will know the results of that
in a week.
Fronted the money for PCB fabrication, and
added an extra hundred dollars for changing the PCB color to
black (good news for those of you who said they didn’t like
the red).
Next update will be when production for the
cases is underway.
5/11/2016
Chase locked my
account until I called them w/ my debit card in hand when I
tried to do a wire transfer. That was fun. Especially the
part where I had to call when it was working hours in the
US, but then had an Indian call center handle my call during
the night here in China.
Still working on getting the
money halfway across the world without being cockblocked by
every institution that handles money ever. Stay tuned.
5/5/2016
(assume all future updates are Beijing time)
All orders
processed and confirmed as paid. The payment period of the
GB is officially over. We are good to go.
Older updates moved to pastebin to reduce OP clutter.
https://redd.it/4b374z
Disclaimer: I am not responsible for any
manufacturing defects. They will be minimized and checked by
the factory to the best of its ability, but there are no
guarantees. The last batch of 11 cases had some minor
imperfections, and a major one being a 4mm scratch on the
surface of someone’s red case.
This is a 96-key multi-layout aluminum Chinese custom
mechanical keyboard. The plate is aluminum and universal,
and supports a variety of layouts (but /not/ 3x 1u
to the right of the space bar for 3 modifiers + arrow
keys).
The plate and case are anodized 6061 aluminum,
available in 12 colors (+ silver):
[
Supported layouts] (does support ISO)
[
Color options] (Updated, here’s the old one:
http://i.imgur.com/DLEQPZY.jpg)
Cost is $300 $315 to get the kit to your door within
the CONUS, no extra/hidden fees (hopefully) fug, no bs.
[
Order form]
[
Some builds from the previous buy]