类型: GB
作者: Dunne
发布时间: 2022-10-29
01:48:37
更新时间: 2022-11-04 11:59:38
原链接:
https://geekhack.org/index.php?topic=118708.0
Kitsune
Kitsune FCFS international GB is live over at
Mechkey:
https://mechkey.store/blogs/store-updates/kitsune-international-gb
Discord
Instagram
Typing Tests
Proto 1 - Top
Mount
Proto 2 - Top Mount
ScuffedBoards Typing
Test of Proto 2
LightningXIs VOD of Proto 1
Group Buy Information
Group Buy Date:
November 4th (7AM PDT start)
Group Buy
Type: FCFS via Google Form on Mechkey
Unit cap: 60 units
What’s
Included
- Aluminum Top and Bottom Case
- External Brass Weight or Aluminum Weight
- Aluminum Plate
- Mechlovin Infinity 87.5 PCB (Soldered)
- Hard Carrying Case & Microfiber cloth
- Geon Feet
-
Screws: x8 M2.5 and x12 m2
Pricing
Kit Price (USD): - Kitsune Aluminum Kit: $400
-
Kitsune Brass Kit: $430
Extra Price (USD): - Extra External Brass Weight: $80
- Extra External Aluminum Weight: $60
- Extra Mechlovin’ Infinity PCB: $50 (max 1 additional PCB per GB Order)
- Extra Aluminum Plate: $50
-
Extra PC Plate: $45
Specs
Mount: Top and Gummy O-Ring - Layout: F13 TKL | WKL
- PCB: Infinity 87.5 variant from Mechlovin’
-
Materials:
o Top and Bottom Case: Aluminum 6063
o Weight: Clear Coated Brass or Aluminum 6063
o Plate: Aluminum 5052 (All plates are color matched to the top and bottom case.
Excluding the Silver kit which comes with a red plate), Polycarbonate | ANSI and ISO support -
Colors:
o Top and Bottom Case: Anodized Silver, Burgundy & Black
o Weight: Clear Coated Brass and Aluminum weight color options (Black, Silver, Gray, Burgundy and Red) - Top arrow cluster engraving: Hiragana or no engraving options
- Heft: 1.6kg (Alu Weight Configuration), 2.1kg (Brass Weight Configuration), 2.48kg built
-
Adjusted Front Height(s) & Typing Angle:
-
Supported Layouts:
Aluminum & PC Plate renders:
Shipping
Shipping will be conducted by Mechkey and it will be dispatched from Vietnam to the US via DHL for approximately $50-60.
International shipping may differ and should be asked within Mechkey’s Discord.
Lead Time
Approximately 3-4 Months (Im considering leeway for manufacturing delays, transportation to vendor(s), QC, and packing included in this timeline)
Links
Vendor
Discord
Instagram