tl;dr at bot
Hi GH
As the IC was quite successful due to many people having the same sourcing issue, I suggest we move onto the GB stage ;)
The GB can be entered following this link: https://forms.gle/A3nGdMF5LPuH9t2BA
What you’ll receive
A unified C3 Daughterboard including 6” (120mm) JST cable carefully packaged into an ESD bag.
For more details on what you’re purchasing please checkout the git repo here: https://github.com/ai03-2725/Unified-Daughterboard
Pricing
Daughterboard incl cable: 9USD/unit excl. pp fees (5.4% + 0.35EUR) and shipping.
Side note: pricing can drop to 8USD/unit if 50 units are exceeded before I start invoicing. So don’t be surprised if your total is less than expected. :)
Shipping options
I ship directly from Belgium (EU). As shipping is quite expensive over here I offer 2 options:

  • Send as a letter: 5USD (not recommended, max 2 units. This option will be scrapped if not enough interest due to MOQ stamps)
  • Send as a package: 10USD (recommended, boards will be better protected and in a box)
    Side note: if you’re from Belgium/The Netherlands/.. I’ll DM you as I might have some better/local/cheaper options for you.

How do you join?
Fill in the google form ( https://forms.gle/A3nGdMF5LPuH9t2BA) and fill in the details.
Timeline

  • GB closes 26th of September. Invoices will be send out during the week.
  • Week of 27 September: orders will be placed and the waiting (+-6 weeks) starts.
  • After the 6 weeks I’ll need 1 week to pack and ship the orders.
  • Your order arrives within 1-3 weeks depending on where you live.
    Max (IDEAL) waiting time is around 8-10 weeks from GB end date -> shipping out

Additional details

  • The MOQ is set at 30 units. I will not be sending out invoices before I think this MOQ can be reached. If you’re getting an invoice, I’m running the GB.
  • Everyone gets 48h to pay after receiving their invoice or otherwise the order will be cancelled
  • GB’s get delayed. Keep this in mind. Not everything is under my control (e.g. clearance at customs,..)
  • I also run keeb.studio as a small side project so I know how to ship things. No need to worry about that ;)
  • Enjoy your new daughterboard(s) when they arrive :)

TL;DR
What: C3 unified Daughterboard + JST cable
Price: 9usd/unit excl. shipping and fees
Last day to enter: 26th of September
Timeline: 8-10 weeks from GB end date -> shipping out
Where to order: https://forms.gle/A3nGdMF5LPuH9t2BA
Updates

  • 27/09/21: closed GB officially, all remaining invoices are going out tonight.
  • 28/09/21: DB/cables/ESD bags have all been ordered. Current production time of the DB is approx 5-6 weeks.
  • 04/10/21: DB are awaiting assembly.
  • 11/10/21: DB are assembled. Cables/ESD bags seem to be stuck at the warehouse. Contacted supplier to resolve issue.
  • 13/10/21: DB are being shipped this week. Cable/ESD bag supplier is checking out warehouse issue and will contact me asap.
  • 18/10/21: DB have arrived and cables have been cleared and are on their way.
  • 20/10/21: Everything has arrived and is packaged already. Awaiting labels..
  • 01/11/21: Everything has been labeled. Shipping tomorrow!
  • 02/11/21: DB have shipped out. Note: delivery can take 1 - 3 weeks depending on where you live!
,